Ship-operating services | Tenderlake

Ship-operating services

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
07 August 2023
Closing Date:
05 September 2023
Location(s):
DE406 Dahme-Spreewald (DE Germany/DEUTSCHLAND)
Description:
Conditioning residual hole 14/15

In order to maintain a pH value between 6 and 8 in the residual hole (RL) 14/15, the introduction of neutralizing agents (limestone powder and/or fine white lime) by means of an inbrine treatment (by a ship-based water treatment plant) is required.

Conditioning by means of a ship-based water treatment plant:

- former opencast mine Schlabendorf-Süd RL 14/15 (Schlabendorfer See)

The services include all necessary expenses for the delivery and large-scale input of the input materials, which leave the ship-based water treatment plant as a diluted suspension (2-5%) and are turbulently discharged under water in the entire area of Lake Schlabendorf.

In order to maintain a pH value between 6 and 8 in the residual hole (RL) 14/15, the introduction of neutralizing agents (limestone powder and/or fine white lime) by means of an inbrine treatment (by a ship-based water treatment plant) is required.

Conditioning by means of a ship-based water treatment plant in the former Schlabendorf-Süd opencast mine, residual hole 14/15 (Schlabendorfer See) in the period 2024 to 2027:

- Introduction of limestone flour with a reactivity of 30 megamoles and fine white lime with a reactivity of 60 megamoles.

- Necessary use of a ship-based water treatment plant.

The conditioning of the residual hole 14/15 is carried out discontinuously with input quantities of 0.6 megamoles/day up to 0.9 megamoles/day for the conditioning agent limestone flour or from 0.75 megamoles/day up to 3.0 megamoles/day for the conditioning agent white fine lime depending on reacidification (determined by AG with scientific supervision).

,

Use of the ship-based water treatment plant:

The services include all necessary expenses for the large-scale input of the feedstock, which leave the ship-based water treatment plant as a diluted suspension (2 to 5%) and are turbulently discharged under water in the entire area of Lake Schlabendorf.

,

In the procurement procedure and in the contract, a material price escalation clause applies.

Download full details as .pdf
The Buyer:
LMBV Lausitzer und Mitteldeutsche Bergbau-Verwaltungsgesellschaft mbH
CPV Code(s):
63726600 - Ship-operating services