The Free and Hanseatic City of Hamburg intends to renew Königstraße between Max-Brauer-Allee and Reeperbahn, with a section of Veloroute 12, as part of the expansion of the cycle route network. The tendered services are to be carried out in Königstraße between Mörkenstraße and Reeperbahn. The road section has a length of approx. 0.5 km in Königstraße and approx. 0.1 km in Mörkenstraße. In the process, the junctions and the junction areas Mörkenstraße / Blücherstraße / Kirchenstraße / Königstraße and Dosestraße / Königstraße will also be constructed.
The main services are:
Bit. Roadway extension 9,400 m²
Picking up and disposing of solidification under asphalt 5,800 m²
Bit. Construction of the fully completed roadway 9,400 m²
Making watercourse from mastic asphalt 300 m²
Pavement pavement, safety strip, cycle path 5,000 m²
Making parking stalls, crossings with honeycomb paving stones 350 m²
Making stops in concrete construction 350 m²
High curbs set 1,300 m
Setting low curbs 900 m
Glue curbs set 800 m
Bus special board set 80 m
Establish trumm connection cable 180 m
Making debris 50 pcs
Removing and recycling/disposing of soil, base courses 7,500 t
Preparing tree pits 15 pcs
Basic repair of the carriageway of a main road and optimisation of public transport and cycle traffic management. Production of the roadway in full construction, ceiling renovation, production of bus stops in concrete, renewal of curbs, conversion and production of ancillary areas, pipe and drainage work