Heat pumps | Tenderlake

Heat pumps

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
15 March 2023
Closing Date:
17 April 2023
Location(s):
PL714 Sieradzki (PL Poland/POLSKA)
Description:
Delivery and assembly along with the design of renewable heat and electricity sources on school buildings of the Sieradz Commune

The subject of the contract is the development of design and cost estimate documentation as well as the execution of installation and construction works related to the installation of renewable heat and electricity sources on school buildings in the Sieradz Commune.

Installation of renewable heat and electricity sources on the building of the Primary School in Charłupia Mała

The subject of the contract is the execution of the design and obtaining the necessary decisions, opinions and permits, including the decision on the building permit or notification of the intention to perform construction works and the execution of construction works for the installation of renewable heat and electricity sources in the building located in Charłupa Mała at 15 Szkolna Street on plot no. ewid. 98/2 precinct Dzerlin.

The order shall, in particular, include:

-development of a multi-branch construction and executive PT of planned works, obtaining the required opinions, agreements and checks of design solutions in the scope resulting from the regulations,

-development of the energy performance of the building for the building after completion of construction works,

if necessary, obtaining the necessary derogations from the applicable regulations, including the necessary expert opinions and opinions,

– obtaining a building permit (Article 32 of the Construction Law) or making an appropriate notification (Article 30 of the Construction Law),

-performing author's supervision.

-Execution of construction works related to: modernization of the DHW production and distribution system, modernization of the heating system, PV microinstallations.

The scope of comprehensive thermomodernization includes:

-Installation of a renewable source of electricity in the form of a photovoltaic panel system with an installed capacity of 35.36 kW. A system consisting of 104 photovoltaic panels with a capacity of 340.0 Wp each, mounted through a system supporting structure directly to the roof of the building, was planned.

-Modernization of the domestic hot water production and distribution system with partial use of a new source, which will be a reversible air/water heat pump.

-Modernization of the building heat supply system by installing an additional source - a reversible air/water heat pump with a nominal heating power of 91.00 kW, installation of a heat storage tank cooperating with the pump with a capacity of 5000.0 dm3. Installation of new steel plate radiators with built-in thermostatic valves and heads in place of old cast iron ones, in the amount of 34 sets. Installation of a new heating system made of new ducts carried out in thermal insulation in the scope of replacing old cast iron radiators. Hydraulic regulation of the entire installation to adapt it to the reduced heat demand.

-Execution of accompanying works necessary for the proper performance of thermo-modernization works, including: execution of the lightning protection installation of the PV generator, execution of construction works related to the modernization of the heating system: punctures, forging furrows and their bricking, painting, execution of fire bushings. External installation between the heat pump and the building.

Scope of design work:

The construction project should be made in the amount of 4 copies to the extent taking into account the specificity of construction works, the nature of the object and the degree of complexity, in accordance with the requirements contained in the Construction Law and in accordance with the applicable executive acts to the Act, developed in such a range of detail that it is possible to clearly assess the design solutions proposed in it, including in particular:

-design of PV installation

-design of the heating unit

-construction design (PV installation, heat pump)

-design of electrical and lightning protection installations (PV installation, heat pump)

The documentation should also include those elements that are not directly related to the planned construction and installation works, and are necessary to meet the requirements of applicable regulations, including fire protection, safety of human presence and hygienic and sanitary conditions.

Preparation of information on safety and health protection rules due to the specificity of the building, included in the BIOZ plan.

Installation of renewable heat and electricity sources on the building of the Primary School in Chojne

The subject of the contract is the execution of the project and obtaining the necessary decisions, opinions and permits, including the decision on the building permit or notification of the intention to perform construction and installation works for the installation of renewable heat and electricity sources in the building located in Chojne at 1 Główna Street on plot no. ewid. 1223/1 precinct Chojne.

The order shall, in particular, include:

-development of a multi-branch PT construction and executive of planned works,

-obtaining the required opinions, agreements and checks of design solutions in the scope resulting from the regulations,

-development of the energy performance of the building for the building after completion of construction works,

if necessary, obtaining the necessary derogations from the applicable regulations, including the necessary expert opinions and opinions,

– obtaining a building permit (Article 32 of the Construction Law) or making an appropriate notification (Article 30 of the Construction Law),

-performing author's supervision.

-Execution of construction works related to the implementation of: modernization of the DHW production and distribution system, modernization of the heating system, including partial replacement of radiators and wires, PV microinstallations.

The scope of comprehensive thermomodernization includes:

-Installation of a renewable source of electricity in the form of a photovoltaic panel system with an installed capacity of 44.20 kW. A system consisting of 130 photovoltaic panels with a capacity of 340.0 Wp each, mounted through a system supporting structure directly to the roof of the building, was planned.

-Modernization of the domestic hot water production and distribution system with partial use of a new source, which will be a reversible air/water heat pump.

-Modernization of the building heat supply system by installing an additional source - a reversible air/water heat pump with a nominal heating power of 83.30 kW, operating in a system with the existing heat storage tank. Installation of new steel plate radiators in the amount of 102 sets. with built-in thermostatic valves and heads. Installation of a new heating system made of new ducts carried out in thermal insulation in the scope of replacing old cast iron radiators. Hydraulic regulation of the entire installation to adapt it to the reduced heat demand.

-Execution of accompanying works necessary for the proper performance of thermo-modernization works, including: execution of the lightning protection installation of the PV generator, execution of construction works related to the modernization of the heating system: punctures, forging furrows and their bricking, painting, execution of fire bushings. External installation between the heat pump and the building.

Scope of design work

The construction project should be made in the amount of 4 copies to the extent taking into account the specificity of construction works, the nature of the object and the degree of complexity, in accordance with the requirements contained in the Construction Law and in accordance with the applicable executive acts to the Act, developed in such a range of detail that it is possible to clearly assess the design solutions proposed in it, including in particular:

-design of PV installation

-design of the heating unit

-construction design (PV installation, heat pump)

-design of electrical and lightning protection installations (PV installation, heat pump)

The documentation should also include those elements that are not directly related to the planned construction and installation works, and are necessary to meet the requirements of applicable regulations, including fire protection, safety of human presence and hygienic and sanitary conditions.

Preparation of information on safety and health protection rules due to the specificity of the building, included in the BIOZ plan.

Installation of renewable heat and electricity sources on the building of the Primary School of the Sieradz Commune in Sieradz

The subject of the contract is to carry out the design and obtain the necessary decisions, opinions and permits, including the decision on the building permit or notification of the intention to build and installation works for the installation of renewable heat and electricity sources in the building located in Sieradz at 5 Armii Krajowej Street on plot no. ewid. 5269/2.

The order shall, in particular, include:

-development of a multi-branch PT construction and executive of planned works,

-obtaining the required opinions, agreements and checks of design solutions in the scope resulting from the regulations,

-development of the energy performance of the building for the building after completion of construction works,

if necessary, obtaining the necessary derogations from the applicable regulations, including the necessary expert opinions and opinions,

– obtaining a building permit (Article 32 of the Construction Law) or making an appropriate notification (Article 30 of the Construction Law),

-performing author's supervision.

-Execution of construction works related to the implementation of: modernization of the DHW production and distribution system, modernization of the heating system, micro PV installations.

The scope of comprehensive thermomodernization includes:

-Installation of a renewable source of electricity in the form of a photovoltaic panel system with an installed capacity of 46.24 kW. A system consisting of 136 photovoltaic panels with a capacity of 340.0 Wp each, mounted through a system supporting structure directly to the roof of the building, was planned.

-Modernization of the domestic hot water production and distribution system with partial use of a new source, which will be a reversible air/water heat pump.

-Modernization of the building heat supply system by installing an additional heat source - a reversible air/water heat pump. The nominal heating power of the heat pump is 157.6 kW, installation of a heat storage tank cooperating with the pump with a capacity of 5000.0 dm3. Hydraulic regulation of the entire installation.

-Execution of accompanying works necessary for the proper performance of thermo-modernization works, including: execution of the lightning protection installation of the PV generator, execution of construction works related to the modernization of the heating system: punctures, forging furrows and their bricking, painting, execution of fire bushings. External installation between the heat pump and the building.

Scope of design work

The construction project should be made in the amount of 4 copies to the extent taking into account the specificity of construction works, the nature of the object and the degree of complexity, in accordance with the requirements contained in the Construction Law and in accordance with the applicable executive acts to the Act, developed in such a range of detail that it is possible to clearly assess the design solutions proposed in it, including in particular:

-design of PV installation

-design of the heating unit

-construction design (PV installation, heat pump)

-design of electrical and lightning protection installations (PV installation, heat pump)

The documentation should also include those elements that are not directly related to the planned construction and installation works, and are necessary to meet the requirements of applicable regulations, including fire protection, safety of human presence and hygienic and sanitary conditions.

Preparation of information on safety and health protection rules due to the specificity of the building, included in the BIOZ plan.

Download full details as .pdf
The Buyer:
Gmina Sieradz
CPV Code(s):
42511110 - Heat pumps
45000000 - Construction work
45300000 - Building installation work
45311200 - Electrical fitting work
45312000 - Alarm system and antenna installation work
45315300 - Electricity supply installations
45330000 - Plumbing and sanitary works
45331000 - Heating, ventilation and air-conditioning installation work
45400000 - Building completion work
45450000 - Other building completion work
71320000 - Engineering design services