Lot 50 - Drainage 1st BA, renewal of TW house connection
Landestheater Altenburg, Theaterplatz 19, 04600 Altenburg,
Refurbishment of stage machinery and logistical development,
Lot 50 - Drainage 1st BA, renewal of TW house connection
—
Renewal of drainage 1.BA and renewal of TW house connection DN100/DN80
—
REGENWASSERLEITUNG
- 30 m3 demolition of structures
- Pick up and dispose of 45 m of shelves
- Pick up 1 piece of road inlet
- Pick up and dispose of 85 m2 of bitumen cover
- Pick up 6.5 m2 of paving gutter
- Accommodate 21 m2 of concrete slabs
- Pick up and temporarily store 230 m2 of small natural stone paving
- Cutting 35 m bitumen cover
- Remove 20 m drainage pipe
- 30 m3 demolition work
- 400 m3 excavated earth
- 100 m3 Bettungsschichten
- 65 m3 stabilization ditches and structures
- 210 m3 residual backfill trench
- 68 m HS-S Rohr DN 160
- 69 m HS-Rohr DN 200
- 5 concrete shafts DN 1000
Road construction
- 60 m3 Erdabtrag
- 370 m2 of surface and compaction
- 110 m3 frost protection 0/45
- 370 m2 Schottertragschicht
- 230 m2 natural stone paving surface made of temporarily stored material
- 10 m Natursteinborde
—
Drinking water pipe
- Pick up 185 m2 of small natural stone paving and store it temporarily
- Pick up 6 m2 of paving gutter
- 120 m3 excavated earth
- 36 m3 Bettungsschicht
- 82 m3 residual backfill trench
Road construction
- 35 m3 Erdabtrag
- 180 m2 of flat surface and compaction
- 56 m3 frost protection 0/45
- 190 m2 Schottertragschicht
- 56 m2 natural stone paving surface made of temporarily stored material
- 6 m Natursteinpflasterrinne