Drywall work - expanded metal ceiling.
The secretariat and the rooms of the learning workshop of the Maristengymnasium Fürstenzell will be equipped with expanded metal ceiling elements in the course of construction phase 3. In total, an area of approximately 450 sqm of expanded metal ceiling elements is to be mounted.
At the edge, the ceiling is attached to adjacent components in the form of a border upstand. Above the elements shall be applied lamination in the form of a special acoustic fleece.
The substructure shall be attached to the existing reinforced concrete rough ceiling. The appearance should correspond to the ceilings made at previous stages of construction.
The connection to the facade, built-in wardrobes and niches is realized via attached plasterboard ceiling strips. Approximately 75 sqm.