Extensive green roof
"- Dates for performing the main service on the construction site:
Start of performance 1.11.2021; end of performance 13.12.2021
- Description of the procurement:
Make extensive roof greening on:
Institute building 1 210 m
Connecting passage 89 m
— lay separating and protective layers approx. 1 300 m
— insert drainage layer approx. 1 300 m
— paving tiles 60 m
— produce gravel surfaces with edging aluminum strips approx. 160 m
— wet sowing approx. 740 m
— apply vegetation mats approx. 300 m
— Completion care for extensive green roofing approx. 1 200 m