Construction work for gas pipelines | Tenderlake

Construction work for gas pipelines

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
12 July 2022
Closing Date:
18 August 2022
Location(s):
PL911 Miasto Warszawa (PL Poland/POLSKA)
Description:
Execution of construction works consisting in the construction and reconstruction of the gas network as part of Stage IV.5 of the Project "Construction of a gas network in the Warsaw Agglomeration"

Execution of construction works consisting in the construction and reconstruction of the gas network as part of Stage IV.5 of the Project "Construction of a gas network in the Warsaw Agglomeration"

The contract is co-financed by the European Regional Development Fund of the European Union under the Operational Programme Infrastructure and Environment 2014-2020. Action: 7.1 Development of intelligent energy storage, transmission and distribution systems. Priority axis: VII Improvement of energy security under the Co-financing Agreement no. POIS.07.01.00-00-0016/16-00 of the Project "Construction of a gas network in the Warsaw Agglomeration", no. POIS.07.01.00-00-0016/16.

Unlimited, full, direct and free access to information is included in the SWZ with attachments available on the website of the Ordering Party https://zamowienia.psgaz.pl - Public proceedings - Procedure No.: 2022/W400/WUP - 000080.

The subject of the contract is the execution of construction works consisting in the construction of a medium and low pressure gas network in the area of Dolna, Piaseczyńska, Konduktorska and Ludowej streets in the capital city of Warsaw – Mokotów District, consisting in particular in the reconstruction of existing steel sections of the low-pressure gas network into a low-pressure polyethylene network using the open trench and drilling method and the reconstruction of existing steel sections of the gas network low pressure on the medium pressure polyethylene network by relining method in Konduktorska Street. Location: Warsaw- Mokotów District

Journal of Laws No. 50 of the Obr. 1-01-22;

Journal of Laws No. 5, 92, 93, 112/4 of the obr. 1-01-24;

Journal of Laws No. 1/1 of the Obr. 1-02-09;

Oj Nos 1, 2/2, 8/1, 10, 14, 15/1, 16/6, 31, 32 1-03-08

Total length of the gas network after reconstruction: L = approx. 1325 m (length may increase by the length of the approach sections)

Technologia rur: PE100 RC SDR 17,6

PE100 SDR 17,6

PE100 RC SDR 11

DN400 PE100 SDR17.6, L= ok. 195.0 m;

DN355 PE100 SDR17.6, L= ok. 330.0 m;

DN315 PE100 SDR17.6, L= ok. 340.0 m;

DN180 PE100 SDR17.6, L= ok. 40.0 m;

DN110 PE100 SDR17.6, L= ok. 20.0 m;

DN90 PE100 RC SDR17.6, L= ok. 115.0 m;

DN63 PE100 RC SDR17.6, L= ok. 240.0m;

DN32 PE100 RC SDR11, L= ok. 45.0 m

Approximately 910.0 m of the existing n/c gas pipeline and approx. 275.0 m of existing n/c connections as well as 21 bolts and 6 units are planned for decommissioning. dehydrators at the red. station and on gas pipelines.

Detailed technical solutions can be found in the project documentation constituting Annex 4 to the Agreement.

For the execution of Stage IV.5, the Ordering Party made an effective notification of the construction of 31.03.2015, and also started construction within the meaning of the provisions of the Construction Law Act (Journal of Laws of 2018, item 1202, as amended), which was confirmed by an appropriate entry in the internal construction log.

A detailed description of the contract of the subject of the Agreement and the Contractor's obligations includes:

1) Description of the Subject of the Order (OPZ), constituting Appendix No. 2 to the Agreement,

2) Technical Conditions No PSGWA. ZMSM.763.140.2018.G of 23.04.2018 constituting Appendix No. 3 to the Agreement,

3) The project together with the decision on the building permit constituting Appendix No. 4 to the Agreement

4) Technical specification of execution and acceptance of construction works, constituting Appendix No. 5 to the Agreement.

Deadline for the performance of the contract: the deadline for the technical acceptance of the works is set at 8 months counted from the date of conclusion of the Agreement, the deadline for the final acceptance of the works is set at 11 months counted from the date of conclusion of the Agreement.

Pursuant to Article 257 of the PPL Act, the Contracting Authority may cancel the procurement procedure if the public funds that the Contracting Authority intended to allocate to finance all or part of the contract have not been granted to it.

The address of the Ordering Party's website, on which the procedure is posted, the Specification of the Terms and Conditions of the Contract (SWZ) together with attachments (including the Model Contract and the Instructions for awarding contracts co-financed by the European Union in PSG sp. z o.o. (Issue 8 of 23 September 2021) and on which changes and explanations of the content of the SWZ and other procurement documents directly related to the procedure will be made available: https://zamowienia.psgaz.pl - Public proceedings - Procedure number: 2022/W400/WUP-000080

Download full details as .pdf
The Buyer:
Polska Spółka Gazownictwa sp. z o.o. Oddział Zakład Gazowniczy w Warszawie
CPV Code(s):
45100000 - Site preparation work
45111200 - Site preparation and clearance work
45111250 - Ground investigation work
45111300 - Dismantling works
45112000 - Excavating and earthmoving work
45231220 - Construction work for gas pipelines
45231221 - Gas supply mains construction work
45233140 - Roadworks
45233200 - Various surface works
45233222 - Paving and asphalting works
45262212 - Trench sheeting work
45333000 - Gas-fitting installation work