Architectural, engineering and planning services | Tenderlake

Architectural, engineering and planning services

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
06 October 2023
Closing Date:
02 November 2023
Location(s):
DE269 Miltenberg (DE Germany/DEUTSCHLAND)
Description:
Construction supervision Str 5220 Aschaffenburg–Miltenberg - barrier-free conversion of Obernburg-Elsenfeld station

Construction supervision of line 5220 Aschaffenburg–Miltenberg - barrier-free conversion of Obernburg-Elsenfeld station

Basic services BÜW incl. security, building supervision services and services according to the Construction Site Ordinance

Basic services BÜW incl. security, building supervision services and services according to the Construction Site Ordinance

The measure is located in the market town of Elsenfeld, which belongs to the Lower Franconian district of Miltenberg.

Obernburg-Elsenfeld station (Lower Franconia, Bavaria) is located in the DB Netz AG network on line 5220 at km 18.5 in the section between Aschaffenburg and Miltenberg. This is a single-track, non-electrified main line that is not part of the conventional Trans-European Railway Network (TEN). According to the VzG of line 5220, the maximum speed on the through track (Eq. 202) is 120 km/h.

The reconstruction of the Obernburg-Elsenfeld station will be carried out in two construction phases as well as prior clearance of the construction site, starting with the first construction phase with the southern section of the central platform including the elevator shaft and west access. In the second construction phase after the start of use of the southern section, the northern section of the central platform will be renewed and shortened. Prior to the start of construction phase 1, new cable ducts including empty conduits for cable rerouting in order to clear the construction site in the area of the new elevator shaft are to be carried out during construction phase 0.

- Basic services: Construction contracted technical BÜW in accordance with Appendix 1.1 Lot 1+2+3

- Railway operational services and safety monitoring in accordance with Appendix 1.2 Lot 1

- Services according to VV BAU and VV BAU-STE of the EBA according to Appendix 1.3 Lot 1+2+3

- Services in accordance with the Construction Site Ordinance (execution phase) in accordance with Annex 1.4 Lot 1

- Technical services for the TA building in accordance with Appendix 1.6 Lot 1

- Waste management in accordance with Appendix 1.7 Lot 1

- Services in construction management planning in accordance with Appendix 1.8 Lot 1

- Surveying services of BÜW in accordance with Appendix 1.14 Lot 1

The monitoring activity comprises the following technical areas:

- roadway

- structural civil engineering

- other electrotechnical systems

- Control and safety technology

- TA Building

- Demolition work and disposal

- Shoring and groundwater drainage

- Environmental BÜW incl. compensation measures

Construction supervision railway LST

Construction supervision railway LST

Basic services BÜW incl. security, building supervision services and services according to the Construction Site Ordinance

The measure is located in the market town of Elsenfeld, which belongs to the Lower Franconian district of Miltenberg.

Obernburg-Elsenfeld station (Lower Franconia, Bavaria) is located in the DB Netz AG network on line 5220 at km 18.5 in the section between Aschaffenburg and Miltenberg. This is a single-track, non-electrified main line that is not part of the conventional Trans-European Railway Network (TEN). According to the VzG of line 5220, the maximum speed on the through track (Eq. 202) is 120 km/h.

The reconstruction of the Obernburg-Elsenfeld station will be carried out in two construction phases as well as prior clearance of the construction site, starting with the first construction phase with the southern section of the central platform including the elevator shaft and west access. In the second construction phase after the start of use of the southern section, the northern section of the central platform will be renewed and shortened. Prior to the start of construction phase 1, new cable ducts including empty conduits for cable rerouting in order to clear the construction site in the area of the new elevator shaft are to be carried out during construction phase 0.

- Basic services: Construction contracted technical BÜW in accordance with Appendix 1.1 Lot 1+2+3

- Services according to VV BAU and VV BAU-STE of the EBA according to Appendix 1.3 Lot 1+2+3

The monitoring activity comprises the following technical areas:

- roadway

- structural civil engineering

- other electrotechnical systems

- Control and safety technology

- TA Building

- Demolition work and disposal

- Shoring and groundwater drainage

- Environmental BÜW incl. compensation measures

Construction supervision railway TK

Construction supervision railway TK

Basic services BÜW incl. security, building supervision services and services according to the Construction Site Ordinance

The measure is located in the market town of Elsenfeld, which belongs to the Lower Franconian district of Miltenberg.

Obernburg-Elsenfeld station (Lower Franconia, Bavaria) is located in the DB Netz AG network on line 5220 at km 18.5 in the section between Aschaffenburg and Miltenberg. This is a single-track, non-electrified main line that is not part of the conventional Trans-European Railway Network (TEN). According to the VzG of line 5220, the maximum speed on the through track (Eq. 202) is 120 km/h.

The reconstruction of the Obernburg-Elsenfeld station will be carried out in two construction phases as well as prior clearance of the construction site, starting with the first construction phase with the southern section of the central platform including the elevator shaft and west access. In the second construction phase after the start of use of the southern section, the northern section of the central platform will be renewed and shortened. Prior to the start of construction phase 1, new cable ducts including empty conduits for cable rerouting in order to clear the construction site in the area of the new elevator shaft are to be carried out during construction phase 0.

- Basic services: Construction contracted technical BÜW in accordance with Appendix 1.1 Lot 1+2+3

- Services according to VV BAU and VV BAU-STE of the EBA according to Appendix 1.3 Lot 1+2+3

The monitoring activity comprises the following technical areas:

- roadway

- structural civil engineering

- other electrotechnical systems

- Control and safety technology

- TA Building

- Demolition work and disposal

- Shoring and groundwater drainage

- Environmental BÜW incl. compensation measures

Environmental construction supervision

Environmental construction supervision

Basic services BÜW incl. security, building supervision services and services according to the Construction Site Ordinance

The measure is located in the market town of Elsenfeld, which belongs to the Lower Franconian district of Miltenberg.

Obernburg-Elsenfeld station (Lower Franconia, Bavaria) is located in the DB Netz AG network on line 5220 at km 18.5 in the section between Aschaffenburg and Miltenberg. This is a single-track, non-electrified main line that is not part of the conventional Trans-European Railway Network (TEN). According to the VzG of line 5220, the maximum speed on the through track (Eq. 202) is 120 km/h.

The reconstruction of the Obernburg-Elsenfeld station will be carried out in two construction phases as well as prior clearance of the construction site, starting with the first construction phase with the southern section of the central platform including the elevator shaft and west access. In the second construction phase after the start of use of the southern section, the northern section of the central platform will be renewed and shortened. Prior to the start of construction phase 1, new cable ducts including empty conduits for cable rerouting in order to clear the construction site in the area of the new elevator shaft are to be carried out during construction phase 0.

- Basic services: Construction contracted technical BÜW in accordance with Appendix 1.1

- Environmental BÜW according to Appendix 1.11 Lot 4

The monitoring activity comprises the following technical areas:

- roadway

- structural civil engineering

- other electrotechnical systems

- Control and safety technology

- TA Building

- Demolition work and disposal

- Shoring and groundwater drainage

- Environmental BÜW incl. compensation measures

Geotechnical construction supervision

Geotechnical construction supervision

The measure is located in the market town of Elsenfeld, which belongs to the Lower Franconian district of Miltenberg.

Obernburg-Elsenfeld station (Lower Franconia, Bavaria) is located in the DB Netz AG network on line 5220 at km 18.5 in the section between Aschaffenburg and Miltenberg. This is a single-track, non-electrified main line that is not part of the conventional Trans-European Railway Network (TEN). According to the VzG of line 5220, the maximum speed on the through track (Eq. 202) is 120 km/h.

The reconstruction of the Obernburg-Elsenfeld station will be carried out in two construction phases as well as prior clearance of the construction site, starting with the first construction phase with the southern section of the central platform including the elevator shaft and west access. In the second construction phase after the start of use of the southern section, the northern section of the central platform will be renewed and shortened. Prior to the start of construction phase 1, new cable ducts including empty conduits for cable rerouting in order to clear the construction site in the area of the new elevator shaft are to be carried out during construction phase 0.

- Basic services: Construction contracted technical BÜW in accordance with Appendix 1.1

- Environmental BÜW according to Appendix 1.11 Lot 4

The monitoring activity comprises the following technical areas:

- roadway

- structural civil engineering

- other electrotechnical systems

- Control and safety technology

- TA Building

- Demolition work and disposal

- Shoring and groundwater drainage

- Environmental BÜW incl. compensation measures

Download full details as .pdf
The Buyer:
DB RegioNetz Infrastruktur GmbH (Bukr 76)
CPV Code(s):
71240000 - Architectural, engineering and planning services