Engineering design services | Tenderlake

Engineering design services

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
04 June 2021
Closing Date:
20 July 2021
Location(s):
PL214 Krakowski (PL Poland/POLSKA)
Description:
“Construction of the technical design of securing the Wojciech Górny chamber”

The object of the order is to draw up the design documentation of the security of the upper part of the Wojciech Chamber, located at the IIn level of Wieliczka Salt Mine, hereinafter referred to as the “Design Documentation” and to exercise copyright supervision during the implementation of the work provided for by the Documentation design.

1. The object of the order is to draw up the design documentation of the security of the upper part of the Wojciech chamber, located at the IIn level of the Wieliczka Salt Mine, hereinafter referred to as the “Design Documentation” and to carry out copyright supervision during the implementation of the work provided for Design documentation.

2. In the course of the subject of the contract, the Contractor shall be obliged to:

1) the development of the technical design of the security of the upper part of the Wojciech chamber, located at the level of IIn Salt Mine “Wieliczka”, hereinafter referred to as the “Technical Project”, its arrangements with the Ordering Party's services, with the Conservator of the Monuments of Krakow Salt Żup (hereinafter referred to as KZKŻS), and subsequently obtaining the approval of the agreed technical project by the Head of the Mine Wieliczka Salt Mine Movement (hereinafter referred to as the KRZG), together with the implementation of the historical and conservation study for the workings covered by the Technical Project,

2) obtaining the authorisation of the KZKŻS to perform works covered by the Technical Project — KZKŻS operates in accordance with the agreement of 21 June 2017 on the entrustment of certain matters concerning the properties of the Lesser Poland Provincial Conservator of Monuments in Kraków (OJ. Woj. Monkey of 26 June 2017, item 4200),

3) drawing up the subject of works, the investor cost estimate and the in-kind and financial timetable for works covered by the technical project.

3. In the exercise of copyright supervision during the implementation of works covered by the Design Documentation, the Contractor shall be obliged to carry out authorial supervision of a maximum of 96 hours.

Details of the subject matter of the contract and its implementation rules are contained in the Procurement Terms Specification and in the contract template of Annex 15 to SWZ, which are available at: https://kopalniawieliczka.ezamawiajacy.pl/

Download full details as .pdf
The Buyer:
Kopalnia Soli „Wieliczka" Spółka Akcyjna
CPV Code(s):
71320000 - Engineering design services