The historic town hall of Vacha is to be renovated. For this, the services “HLS work side wing town hall” are required. For more information, see tender documents.
• 1 gas condensing boiler, commercial fuel: 12.0 — 49 kW
• 1 compact heating circuit distributor with 1 heating circuit
• 1 flue pipe (approx. 4 m) made of plastic, double-walled
• 35 m gas pipe and accessories
• 25 static heating surfaces (valve radiators)
• 820 m heating cables, pipe insulation
• 2 individual room vents
• 80 m drainage pipes, pipe insulation
• 75 m drinking water pipes, pipe insulation
• 8 sanitary furnishings
• 3 electric instantaneous water heaters
• 2 toilet partitions
• Fire protection and construction imperfections