Roof work:
- Building A + B old school building,
- Part C new school building,
- Component D sports hall.
Cross-component measures
site equipment
Technical processing of all power part covers:
Demolition technology
Installation planning for insulation
Anchoring planning
Installation details skylight domes, anchors, roof inlets
Security facilities
Parapet covers
Wind detection certificates
4.0 years of inspection and maintenance
School components A, B and C
- 972.0 m
- 183.5 m
- 1,449.5 m
- 1 612.5 m
- 972.0 m
- 477.5 m
- 972.0 m
- 1 554.5 m
- 258.0 m
- 200.0 m gravel stiffeners,
- 164.0 m gravel stop rails.
All necessary roof installations including emergency overflow systems, flat roof drains, planks, watertight installations, etc.
- 197.5 m aluminum roof edge cover incl. UK,
- 41.0 pieces of fall protection anchorage points,
- 207.0 m safety rope fall protection.
Sports hall component D.
- 21.0 m cutting trapezoidal sheet metal roofing,
- 132.0 m reinforcement profile for edges and openings trapezoidal sheet roof,
- 1 186.0 m
- 837.0 m
- 837.0 m
- 837.0 m
- 139.0 m
- 145.0 m
- 837.0 m
- 41.0 pieces of fall protection anchorage points,
- 144.0 m safety rope fall protection,
- 349.0 m
- 349.0 m
- 138.0 m gravel stiffeners.
All necessary roof installations including emergency overflow systems, flat roof drains, planks, watertight installations, etc.
- 137.0 m gravel stop rails,
- 207.0 m aluminum roof edge cover incl. UK.