Basic renovation of a laboratory building in 2 implementation stages.
Construction of refrigeration systems consisting of: 2 chillers with approx. 1 100 kW each, 4 units of buffer barbecles between 2.5, 00 and 9 000 l, 6 heat exchangers between 15 to 800 kW, 7 cold distributors, 28 kW pumps, 7 700 m pipe network made of black steel pipe with corossion protection paint for climate control cold-water including fittings, and 9 000 m stainless steel pipe network for laboratory cooling water, including fittings, 7 precision climate control units and 130 circulating air cooling units.