The subject of the call for tenders is the supply of electrical energy (green electricity) for properties and installations by public administrations, mostly in the state of Schleswig-Holstein as full power supply.
Participants' acceptance points were divided into 10 regional and single lots.
In total, there are approximately 3800 collection points, approximately 194.7 GWh.
Lot 1 Regionallos Nordfriesland (NF)Lot 1
Regionally free North Frisia.
618 collection points with reference consumption in 2019 of approx. 20.1 GWh
Lot 10 single lots Christian Albrechts University KielLot 10
Christian Albrechts-Universität Kiel.
14 collection points with a reference consumption of approximately 32.5 GWh in 2019.
Lot 2 Regional ticket Schleswig-Flensburg (SL_FL)Lot 2
Regionally free Schleswig-Flensburg.
357 collection points with a reference consumption of approx 14.1 GWh in 2019.
Lot 3 Regionallos Rendsburg-Eckernförde/Neumünster/Plön (RD_NMS_PLÖ)Lot 3
Regionally free Rendsburg-Eckernförde/Neumünster/Plön.
634 collection points with a reference consumption of approx. 19.0 GWh in 2019.
Lot 4 Regional Dithmarschen/Steinburg (HEI_IZ)Lot 4
Regionally free Dithmarschen/Steinburg.
553 collection points with a reference consumption of approximately 10.6 GWh in 2019.
Lot 5 regional tickets Kiel (KI)Lot 5
Regionally free keel.
205 collection points with reference consumption of approximately 28.3 GWh in 2019.
Lot 6 Lübeck (HL)Lot 6
Regionally free Lübeck.
184 collection points with a reference consumption of approx. 16.1 GWh in 2019.
Lot 7 Regionallos Ostholstein/Segeberg (OH_SE)Lot 7
Ostholstein/Segeberg regionally free.
642 collection points with a reference consumption of approx. 17.2 GWh in 2019.
Lot 8 Regionallos Pinneberg/Stormarn/Duchy of Lauenburg (PI_OD_RZ)Lot 8
Pinneberg/Stormarn/Duchy of Lauenburg.
409 collection points with a reference consumption of approximately 34.3 GWh in 2019.
Lot 9 Husum single lotsLot 9
Husum single.
184 collection points with reference consumption of approximately 2.5 GWh in 2019.