Dismantling work in the town hall and building authority with the following services:
- non-load-bearing interior walls, aerated concrete/masonry, approx. 300 m²
- Wooden stud walls (partly incl. glass elements), approx. 150 m²
- Trockenbauwände. approx. 165 m²
- Wandbekleidungen, ca. 940 m²
- Ceiling and sloping roof cladding, approx. 840 m²
- Bodenaufbauten, ca. 860 m²
- Dämmmaterialien (KMF), ca. 810 m²
- Sewage, water and gas plants
- Ventilation systems
- heat supply systems
-ELT