Construction work | Tenderlake

Construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
28 December 2022
Closing Date:
30 January 2023
Location(s):
PL622 Olsztyński (PL Poland/POLSKA)
Description:
"Energy business – Photovoltaic farm and heat pump"

1. The subject of the contract includes the construction within the scope covered by the design documentation for the investment entitled "Construction of heat pump installations with a total heating capacity of 1500 kW and a photovoltaic farm and parking lots with a total capacity of approx. 950 kW along with the necessary technical infrastructure at the Olsztyn-Mazury Airport in Szymany on plots No. 463/35, 463/37, 463/40, 464/7, 859/1, 860/1, 3883/1 and 3883/3 within the geodetic area of Szymany, Szczytno commune, for which the investor is Warmia and Mazury Sp. z o.o."

2. DETAILED DESCRIPTION OF THE SUBJECT OF THE CONTRACT – constitutes Annex 1 to the SWZ, which includes: Architectural and construction design with a building permit constituting Annex 1a to the SWZ (for parts I and II) and Technical Design with bills of quantities and specifications constituting Annex 1b to the SWZ (for parts I and II).

Construction of heat pump installations with a total heating capacity of 1500 kW

Part I:

TASK I. Construction of heat pump installations with a total heating capacity of 1500 kW for the following areas:

Area 1 (HP1) boiler room terminal: it is planned to introduce ground source heat pump technology with a heating capacity of 700 kW together with the accompanying infrastructure,

Area 2 (HP2) boiler room tower: the planned project will consist in the introduction of ground source heat pump technology with a heating capacity of 308 kW together with the accompanying infrastructure,

Area 3 (HP3) boiler room building no. 8: introduction of heat pump technology with a heating capacity of 108 kW together with accompanying infrastructure,

Area 4 (HP4) hangars boiler room (container engine room): the planned project will consist in the construction of a new container boiler room with the installation of ground heat pumps with a heating capacity of 374 kW together with the accompanying infrastructure,

Area 5 (HP5): introduction of air heat pump technology with a heating capacity of 10 kW with associated infrastructure.

TASK II. Construction of internal installations in hangar buildings.

Construction of a photovoltaic farm and parking cars with the necessary technical infrastructure

Part II:

Task I. The construction of a photovoltaic farm and parking cars along with the necessary technical infrastructure will cover the following areas: Area 1 (FV1) photovoltaic farm: The designed photovoltaic farm on the plot no. 463/35. It will consist of photovoltaic modules with anti-reflective coating, mounted on metal supporting structures. Area 2 (FV2): Designed structure with photovoltaic panels in an existing car park with a total capacity of approximately 46.5 kWp and an area of approximately 260 m², carport.

Task II. Construction of a fence and monitoring of the farm.

Download full details as .pdf
The Buyer:
Warmia i Mazury Sp. z o.o.
CPV Code(s):
45000000 - Construction work
45100000 - Site preparation work
45111000 - Demolition, site preparation and clearance work
45231000 - Construction work for pipelines, communication and power lines
45311000 - Electrical wiring and fitting work
45317000 - Other electrical installation work
45330000 - Plumbing and sanitary works