New construction of the Gröditz sports hall - lot 309 - screed
Approx. 850 m 2 Bitumen sheeting; bound bulk; EPS floor insulation and screed.
Screed work consisting of:
- 870 m 2 Cleaning of the surfaces to be processed, including disposal of waste,
- Laying of approx. 765 m 2 1-layer bitumen welding membrane for sealing the floor slab in contact with the ground,
- Installation of approx. 820 m 2 bound bulk,
- Installation of approx. 820 m 2 EPS floor insulation of various thicknesses and requirements,
- Laying of approx. 870 m 2 Screed of various thicknesses and technical properties. Incl. Special constructions, including the use of screed additives.