Design and construction of the S19 expressway on the section Jawornik - Lutcza length approx. 5.25 km
As part of the order, you must design and build:
• an expressway with a dual carriageway section of approx. 5.25 km long: Passenger Service Place MOP II Jawornik str. right, (i.e. MOP I with a reserve of land under category MOP II);
• Two-nave Road Tunnel T-2;
• technical buildings at the tunnel with equipment;
• road engineering facilities;
• reconstruction of existing roads in terms of collision with the S19 route;
• additional roadways serving the adjacent area;
• hardening of the area for maintenance;
• technical roads;
• infrastructure for pedestrians and cyclists;
• environmental protection devices including animal passages;
• acoustic, anti-dazzle and windward screens;
• infrastructure for the needs of facilities located along the expressway, including: power supply and lighting networks, rainwater drainage with cleaning devices, water and sewage pumping stations, technological channels and others;
• reconstruction of colliding equipment and networks of existing underground and above-ground infrastructure — demolition of buildings and structures;
• road marking and road safety equipment;
• road and tunnel traffic management system;
• technological channels;
• planting greenery;
• construction or reconstruction of exits to plots;
• protection of landslides and landslide predisposed areas;
• other preparatory, auxiliary and organizing work.
Above €5,382,000.