New construction of the Predazzoallee residential building, heating and ventilation work
New construction of the Predazzoallee residential building, heating and ventilation work
-Construction of a heat pump system with approx. 120 kW and 4000 L
Buffer volume for heat supply and DHW preparation
-Central water heating by means of a fresh water station
-Heat distribution from copper and seamless steel pipes approx. 550 m
-heated area approx. 1500 m²
-Space heating surfaces by means of underfloor heating, towel radiators
electr. and tubular radiators in stairwells and drying rooms
-Installation of approx. 40 single-room fans
-Installation of 4 basement ventilation systems with dew point control
-Installation of a garbage room ventilation system
-Air duct network with approx. 300 m spiral seam pipe