3.1. The subject of the contract is the preparation of expert opinions on the assessment of the documentation on the EC verification of the subsystems: (1) Control-Command and Signalling Track-side, (2) Infrastructure, (3) Energy.
3.2. The subject of the contract has been divided into three parts, as follows:
3.2.1. Part 1: Preparation of expert opinions on the assessment of the 'EC' verification file of the Control-Command and Signalling Track-side Subsystem.
3.2.2. Part 2: Preparation of expert opinions on the assessment of the EC verification documentation of the infrastructure subsystem.
3.2.3. Part 3: Preparation of expert opinions on the assessment of the EC verification file of the energy subsystem.
Preparation of expert opinions on the assessment of the EC verification documentation of the Control-Command and Signalling Trackside Subsystem.Preparation of expert opinions on the assessment of the EC verification documentation of the Control-Command and Signalling Trackside Subsystem.
Preparation of expert opinions on the evaluation of the documentation on the EC verification process of the infrastructure subsystem.Preparation of expert opinions on the evaluation of the documentation on the EC verification process of the infrastructure subsystem.
Preparation of expert opinions on the evaluation of the EC verification dossier of the energy subsystem.Preparation of expert opinions on the evaluation of the EC verification dossier of the energy subsystem.