Structural work, including earthworks, Saarland University Hospital (UKS) Homburg, new construction of the Clinic for Orthodontics
The measure includes the construction of approx. 880 m² of orthodontics spread over outpatient and management areas, teaching, seminar, laboratory and ancillary rooms.
The space program envisages a 2.5-storey building (1st floor, ground floor, basement), is designed as a solid construction with reinforced concrete ceilings, reinforced concrete beams, reinforced concrete walls and reinforced concrete columns. Masonry is planned for the closure of the F90 shafts. The basement of the orthodontics department is planned as a WU construction with fresh concrete composite film in special construction.
Approx. 5,910 m³ excavated earth
Approx. 710 m² floor/foundation slab
approx. 2,200 m² Stahlbetonwände
Approx. 30 m² prefabricated reinforced concrete stairs
approx. 956 m² Stahlbetondecken
approx. 805 m² Stahlbetondach
Ca. 215 to Betonstabstahl
Ca. 30 to Betonmattenstahl
Ca. 710 m² FBVS (horizontal)
Approx. 430 m² FBVS (vertical)
Approx. 500 running metres of ground pipes
Approx. 3 shafts
Approx. 300 m grounding
Approx. 250 running metres of concrete inlay work ELT