Joint task Improving the Regional Economic Structure (GRW)
Touristic development of the Botanical Museum
GRW Infra 09/18, BAFA project no. 48/11/5009,
here: Delivery and installation of refrigeration and ventilation systems
For the new media technology of the exhibition area, new technical rooms with media cabinets will be built in the building or Elt rooms will be equipped with additional equipment so that these rooms have to be cooled.
The toilet areas on the basement floor to be converted in the construction project are windowless, so that they will be equipped with a mechanical exhaust air system that guides the exhaust air over the roof. The barrier-free toilet, which is not directly connected to the other toilet areas, is ventilated with a wall-mounted air dispenser, which vents through the outer wall.
Scope:
1 DN200 duct fan, 45 m spiral seam pipe DN100-200, 1 BSK, 1 wall-mounted ventilation machine, 1 flat centrifugal fan, 3 power inverters 5.0 and 6.0 kW, incl. drip pans, condensate pumps, approx. 100 m of 6-16 mm refrigerant double pipes, approx. 290 m of electrical cables between the units, 13 fire bulkheads