The subject of the framework agreement is control tests in road construction and further building material tests in accordance with the specifications of the service description.
The services are divided into the following service areas:
Performance range 01: Soils, soil improvement and soil consolidation according to ZTV E-StB
Performance range 02: Layers without binder according to ZTV SoB-StB
Performance range 03: Base layers with hydraulic binders and concrete road slabs according to ZTV Beton-StB
Performance range 04: Asphalt construction methods according to ZTV Asphalt-StB
Performance range 05: Bitumen investigations according to TL bitumen-StB and investigations on bitumen emulsions according to TL BE-StB
Performance range 06: Surface properties
Performance range 07: Road marking - Testing of the finished power in new condition according to ZTV M
Service area 08: Environmental analysis
,
The service areas are determined on the basis of the specification of terminology in this
Notice form hereinafter also referred to as "lots".
,
The conclusion of the framework contracts for the provision of the services specified in the
Description of services (Annex 1 to the framework agreement)
Services are provided by way of a so-called "open-house procedure". (see
For more details, see Section VI.3 and the cover letter that provides information on the information referred to in Section I.3
specified electronic address).
,
The framework agreement to be concluded includes individually for each contractor
those in the terms of reference (Appendix 1 to the framework income)
for which the admission requirements are met with the
application for admission. The framework agreement to be concluded
includes the provision of services in the area of responsibility of those branch offices
the branch of the client's branch in northern Bavaria, for which a contractor has worked on
his application for authorisation has been admitted.
,
Individual contracts awarded on the basis of the framework agreement concluded may include all services or only parts of one or more service areas for which a contractor has been approved.
,
The open house procedure runs from publication until 31.05.2025 and can be extended twice by 1 year each. Applications for authorisation and thus also the conclusion of a framework agreement can be made during the entire duration of the open house procedure.
,
A framework agreement comes into force with the admission of an interested party and ends on 31.05.2025, subject to an extension option. The framework agreement can be extended twice until 31.05.2026 or 31.05.2027 - analogous to the open house procedure - due to the extension option. Further details are regulated by the framework agreement.
: Soils, soil improvement and soil consolidation according to ZTV E-StBThe subject of lot / service area 1 are tests with regard to soils, soil improvement and soil consolidation according to ZTV E-StB.
The details can be found in the service descriptions.
Coatings without binders according to ZTV SOB-StBThe subject of the lot / performance area 2 are tests with regard to coatings without binders according to ZTV SoB-StB.
The details can be found in the service descriptions.
Base courses with hydraulic binders and concrete road surfaces according to ZTV Beton-StBThe subject of lot / performance area 3 are tests with regard to base courses with hydraulic binders and concrete road surfaces in accordance with ZTV Beton-StB.
The details can be found in the service descriptions.
Asphalt construction methods according to ZTV Asphalt-StBThe subject of lot / service area 4 are tests with regard to asphalt construction methods according to ZTV Asphalt-StB.
The details can be found in the service descriptions.
Bitumen investigations according to TL Bitumen-StB and investigations on bitumen emulsions according to TL BE-StBThe subject of lot / performance area 5 are tests with regard to bitumen tests according to TL Bitumen-StB and tests on bitumen emulsions according to TL BE-StB.
The details can be found in the service descriptions.
Surface propertiesThe subject of the lot / performance area 6 are tests with regard to surface properties.
The details can be found in the service descriptions.
Road marking - Testing of the finished performance in new condition according to ZTV MThe subject of the lot / performance area 7 are tests with regard to road marking - testing of the finished service in new condition according to ZTV M.
The details can be found in the service descriptions.
Environmental analysisThe subject of lot / service area 8 are environmental analysis services.
The details can be found in the service descriptions.