As part of a general renovation, the Gymnasium Olching is being rebuilt, slightly expanded and completely reorganized.
of the floor plan adapted to the requirements of a modern school building. First of all, all non-load-bearing components on the inside as well as the
Windows and roof waterproofing dismantled. In small sub-areas, pollutants also have to be dismantled. According to the
Demolition work involves interventions in the load-bearing structure of the building with demolition and renewal of ceilings, addition and
Reinforcement of columns and foundations as well as dismantling of the exposed concrete slabs on the façade. In the further course of construction, the entire
Interior fittings with all installations as well as a completely new façade and roof construction, partly as a compact roof, partly as a light
sloping profiled sheet roof.
Execution of the dismantling work in the Gymnasium Olching consisting of:
-approx. 2,800 m² GK ceiling smooth and perforated including UK and MF insulation layer
-approx. 6,300 m² metal panel ceilings with UK and insulation boards with KMF
-approx. 7,000 m² carpet and linoleum floor coverings
-approx. 3,000 m² tiles on floor and walls
-approx. 9000 m² floor constructions with screed and insulation layers/dividers
-approx. 5500 m² non-load-bearing partition walls made of GK or metal system walls
-approx. 550 m² glass-metal door elements or walls
-approx. 4200 m² flat roof construction with bitumen waterproofing and insulation layers
-approx. 2,500 m³ in-situ concrete and approx. 7,500 m² formwork slabs
-approx. 1,700 m² metal window constructions incl. blind systems
-approx. 800 m² floor coverings with adhesives containing asbestos (expansion in the black area)