Replacement new bridge Us9 over the B241neu and DB line
- technical processing of the execution planning
- manufacture of excavation pit installations
- earthworks
- production of stb. substructures (flat foundation)
- Production of the superstructure (3-field frame structure with ÜKO and drag plates) as a prestressed slab beam on shoring scaffolding, approx. 315 m² bridge area