A9 km 0,000-11,160 right RF with A10, km 97,055-98,611 and AD Potsdam Ast GM, lot 1, partial service 1 road construction and partial service 2 repair bridges
. approx. 11,000 m of shrub stock in the median strip clearing
. Approx. 95 pcs. regulate processes and set up attachment by process
. approx. 15,000 m of banquet peeling
. dispose of approx. 3,300 t banquet, LAGA assignment up to Z2
. produce approx. 7,800 m² of temporary MSÜ, NHB and B/V strips in aspahlt construction
. approx. 19,200 m asphalt pavement separate 3-6 cm
. approx. 19,200 m asphalt pavement separate 6-12 cm
. approx. 227,500 m² asphalt milling 2.5 - 4.5 cm thick
. approx. 220,000 m² asphalt milling 6.0 - 8.0 cm thick
. produce approx. 220,000 m² asphalt binder 8 cm thick
. produce approx. 5,000 m² asphalt binder 5 cm thick
. approx. 227,500 m² of grit mastic asphalt cover layer 4.0 cm thick
. produce approx. 4,200 m² cast asphalt surface layer (buildings)
. approx. 850 m² cast asphalt surface layer in gutter, 0.50 m wide, production
. produce approx. 21,300 m seam, in asphalt layer 7.5 - 9.0 cm thick
. Produce approx. 21,000 m joint, 4.0 cm thick in asphalt layer
. set approx. 2,500 m curb (TB or HB)
. Remove and rebuild approx. 4.0 induction loops
. Approx. 1.0 pcs. emergency call post
. dissolve and recycle approx. 1,750 m³ of soil
. supply and install approx. 500 m³ of soil
. Approx. 266 m concrete protective wall on buildings, build foundation and concrete backfill