Structural shell work | Tenderlake

Structural shell work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
28 April 2023
Closing Date:
26 May 2023
Location(s):
FR105 Hauts-de-Seine (FR FRANCE)
Description:
public works contract for the development of the Delage school complex

the consultation is passed by Open Call for Tenders pursuant to Articles L.2124-2, R. 2124-2 1 ° and R. 2161-2 to R.2161-5 of the Public Order Code. For each lot, it will give rise to the conclusion of a public contract at a fixed price. The estimated overall duration of the services (including site preparation period) is estimated at 10 months, not counting the year of guarantee of perfect completion applicable to works contracts, until the execution of the associated work

structural work - Second work - fluids

The time taken to perform the contract is as follows:- preparation period:o 4 weeks for the 3 lots, from the date of notification of the contract, - execution of the work all lots combined: 9 months in total, at the end of the preparation period. The specific deadlines according to the lots and the services are defined in the schedule provided by the City. As an indication, the start of the services (preparation period included) is scheduled for the month of July 2023. The School must open imperatively for the start of the school year in September 2024, all completed lots and authorization to open the safety commission

Outdoor Facilities

The time taken to perform the contract is as follows:- preparation period:o 4 weeks for the 3 lots, from the date of notification of the contract, - execution of the work all lots combined: 9 months in total, at the end of the preparation period. The specific deadlines according to the lots and the services are defined in the schedule provided by the City. As an indication, the start of the services (preparation period included) is scheduled for the month of July 2023. The School must open imperatively for the start of the school year in September 2024, all completed lots and authorization to open the safety commission

Kitchen Equipments

The time taken to perform the contract is as follows:- preparation period:o 4 weeks for the 3 lots, from the date of notification of the contract, - execution of the work all lots combined: 9 months in total, at the end of the preparation period. The specific deadlines according to the lots and the services are defined in the schedule provided by the City. As an indication, the start of the services (preparation period included) is scheduled for the month of July 2023. The School must open imperatively for the start of the school year in September 2024, all completed lots and authorization to open the safety commission

Download full details as .pdf
The Buyer:
ville de Courbevoie
CPV Code(s):
45112700 - Landscaping work
45223220 - Structural shell work
45421151 - Installation of fitted kitchens
45432000 - Floor-laying and covering, wall-covering and wall-papering work