The Hauptschule and Realschule will be converted into a secondary school in sections. Fire protection and safety issues are particularly taken into account during the renovation. Here the delivery and installation of a cable passenger elevator is tendered.
The Hauptschule and Realschule will be converted into a secondary school in sections. The existing school building will be converted in 6 construction phases (AF). This tender includes the elevator system in the 3rd refurbishment section, 3-storey structure, approx. 1,500 square meters of usable space. Delivery and installation of a cable passenger lift according to EN 81-70 suitable for the disabled.