Primary scope: Retrofit of the Run-Off-River Hydro Power Plant which is dated from 1952 equiped with 3 vertical Kaplan turbines of 3,3MW each. Retrofit is planned to start in 2023.
Secondary scope: Retrofit of the generators.
Lot 1:
- The retrofit of 2 out of 3 turbines and optionally the third one.
- The replacement of the oil governor and implementation of digital governor
- The supply and installation of the turbine control & protection system including local HMI
- The supply and installation of a low voltage cabinet for the turbines auxiliaries consumers
- The supply of the associated mechanical and electrical auxiliaries, accessories, and instrumentations
Lot 2:
- The lifetime extension works of 2 out of 3 generators and optionally the third one
- The retrofit of the excitation system
- The retrofit of the generator’s control & protection system including local HMI
- The supply of the associated mechanical and electrical auxiliaries, accessories and instrumentations