As part of the energetic modernization of the component [KJF] of the Campus Handwerk of the Hanover Chamber of Crafts in Garbsen, the training rooms F07 and F08 of the electrical department, as well as the storage areas and the master office will be equipped with dissipative flooring, including all preliminary and secondary work.
Execution period around November 2020.
The advertised services include preliminary and ancillary work, as well as laying a conductive PVC floor covering according to DIN with skirting boards, primer, leveling layer, inserting copper tape for connection to on-site potential equalization, conductive adhesive.
- approx. 235 m
- Install approx. 100 m of copper tape in a conductive manner;
- approx. 120 m skirting boards, 12/60 mm, including inside and outside corners;
- approx. 150 m sealing in the color of the floor.