Construction work required for the construction of the outdoor facilities with sports and break areas for the new three-pass secondary school with two-field sports hall.
site equipment
150 m² gravel surface BE break off, dispose of
2100 m² break off asphalt pavement, dispose of
Remove and dispose of 2400 m³ of soil
1250 m³ plan improvement
1200 m² frost protection layer
Produce 450 m of drainage lines and drainage
144m³ storage volume produce rain retention
Produce 100 m² of parking space
Produce 2655 m² water-permeable paving surface
Produce 1100 m² water-permeable paving surface in sand coloured
Produce 290 m granite stone paving as a one-liner
Installing 825 m² water-bound ceiling
Produce a 30 m seating step system
Produce 69 stair treads
18 m HPL seat supports
800 m² small playing field made of plastic flooring
580 m² sprint track made of plastic flooring
120 m² long jump system made of plastic flooring
320 m² shot putting system made of tennis surface
35 pcs seat cubes
10 youth benches
2 table tennis tables
1 pc climbing tetragoda
1 greenhouse
80 bicycle leaning bars
Install 520 m³ topsoil
Planting and caring for 28 high stems with stu 25-30 cm
Planting and caring for 7 high stems with stu 16-18 cm
Produce and care for 775 m² of shrub planting