Construction of telecommunications cable ducts, Friedland Stadt, MSE district.
As part of a FTTB development, the city of Friedland in the Friedland office is to be developed in the MSE district with a FTTB network.
The tendered services refer to the necessary civil engineering work, the laying of the pipes as well as the setting of shafts and network distribution cabinets. Parallel to the civil engineering works the marketing takes place. Therefore, depending on the state of marketing at the time of the civil engineering works, a one to two digit number of house connections can be expected.
The average length of the access roads is 12.6 m for a total of 72 objects included in this measure. Due to the ongoing marketing, an estimated number of 10 to 20 house connections to be realized are to be assumed within the scope of the development measure.
The work should take place in the period KW02 / 2020 to KW18 / 2020. Frost-related interruptions are not taken into account in the time planning and may lead to a longer execution period.