LV 307 - Joinery
The carpentry work concerns the school building, which in the 70s in reinforced concrete skeleton construction
was built. The other surrounding school buildings and sports facilities are not part of the
Measure.
LV 307 - Joinery
For the existing middle school, the following services are required:
- Wooden door elements with wooden block frame
- Wooden door elements with wooden block frame with laterally fixed glazed elements and skylights
- Wooden door elements with steel enclosure frame
- festverglaste Sichtelemente