Engineering design services | Tenderlake

Engineering design services

Contract Value:
EUR 590K - 590K
Notice Type:
Contract Notice
Published Date:
02 July 2021
Closing Date:
03 August 2021
Location(s):
DEB32 Kaiserslautern, Kreisfreie Stadt (DE Germany/DEUTSCHLAND)
Description:
Fraunhofer FIT — V_114_750816_D_Technical Equipment HLSK AG 1, 2, 3, 7 and 8

Step-by-step commissioning of service phases 2-4 and 5-8, optionally service phase 9 HOAI in accordance with the model contracts of RBBau. Total cost KG 200-700 (excluding initial equipment), max. 19 436 000 net (excluding VAT). The project is implemented in the ZBAU process, including the preparation of an application and construction document as well as perception of a concept discussion with the donors.

fixed price contract! Fee according to HOAI according to the model contracts of RBBau. Commissioning LPH 5-8 at the earliest upon receipt of the approved application and construction document. Honorary zone (§56 HOAI): II to III, fee rate (§56 HOAI): minimum rate

Amount of the additional costs: acc. RIFT-Bund in the latest version

The conversion surcharge is no% - The building fabric to be processed is remunerated as follows: none.

The project group Business Information Systems of the Fraunhofer Institute for Applied Information Technology FIT is an internationally recognized and regionally anchored research area in Bayreuth and Augsburg with a focus on digitization and business information systems, in particular digital disruption, digital business and digital transformation. The project group's scientifically sound business informatics competence, which is indispensable for the development of solutions in the area of selected bowl technologies (e.g. blockchain, Internet of Things and artificial intelligence), is a new building with a corresponding research-supporting facility (e.g. workshops and software laboratories, showrooms, presentation and seminar areas, co-working spaces, creative and experiment environments and test tracks for robots) in Bayreuth. Another core competence of the project group lies in the areas of energy and mobility, which should also be reflected in the realization of the new building. With the new building, research activities can thus be carried out at the highest level within the broad range of content, from business-related to technology-related topics in business information systems.

EUR 20 million is planned for the realization of the building. With these funds, a new building with 2 083 m 2 usable space (NF) is to be built for 148 workplaces.

The Fraunhofer Society, and users in particular, attach great importance to the realization of an innovative, sustainable and resource-saving building and energy concept.

Download full details as .pdf
The Buyer:
Fraunhofer Gesellschaft zur Förderung der angewandten Forschung e. V.
CPV Code(s):
71320000 - Engineering design services