1. The subject of the Order is the development of complete design documentation and performing author's supervision for the task: Connection of WP Lwówek to the Polish Section of SGT Yamal-Europe along with the construction of the Gas Compressor Station (TG Lwówek).
2. A detailed description of the item of the Order includes Attachments 1 to SWZ - Description of the Order Object and Attachments 2 to SWZ — template of the contract.
1. The subject of the Order is the development of complete design documentation and performing author's supervision for the task: Connection of WP Lwówek to the Polish Section of SGT Yamal-Europe along with the construction of the Gas Compressor Station (TG Lwówek).
2. A detailed description of the item of the Order includes Attachments 1 to SWZ - Description of the Order Object and Attachments 2 to SWZ — template of the contract.