As part of the basic maintenance of the Köpenick fire station, the following services for the construction of a stationary network replacement system are being advertised: s. Point II.2.4) Description of the procurement.
- 1 pc power generation system 230 / 400VAC / 85kVA safety power supply parallel operation diesel engine liquid-cooled,
- 1 pc switchgear fully automatic.
- 1 piece of proof of performance rotating system load run 3h,
- 1 piece of display panel NEA messages,
- 1 pc fuel system bridging time 72h / fuel tank 2000l steel / fuel line system including hand pump,
- 1 pc ventilation unit room (weather protection grille, louvre flaps, sound insulation, duct,
- 1 pc. Power plant and accessories,
- 1 pc of fuel tank first fill,
- 1 pc integration of power generation system control in NSHV,
- 1 hour commissioning of the power generation plant,
- 1 piece of work and assembly planning for the emergency power system,
- 1 pc exhaust pipe system including soot particle filter, muffler, deflector hood, thermal insulation, wall duct, roof penetration,
- 1 pc soot particle filter, silencer,
- 1 pc. Work and assembly planning exhaust pipe system, as well as various connection work, commissioning work, testing and measurement work, documentation.