Construction work | Tenderlake

Construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
17 October 2018
Closing Date:
05 November 2018
Location(s):
PL227 Rybnicki (PL Poland/POLSKA)
Description:

The subject of the contract is construction works for the multifamily building under construction No. 4 located in Żory at Aleja Unii Europejska, consisting in comprehensive completion of earthworks and shell works, as well as external and internal finishing works, including the roof of the garage inverted.

The subject of the contract is work. for the multi-family building No. 4 under construction consisting in the comprehensive completion of earthworks and the shell state as well as the execution of external and internal finishing works together with the construction of the garage roof in an inverted arrangement. The contracting authority commissions for execution a) Comprehensive completion of earthworks and the building shell. No. 4, Planting the area around the building, Bricklaying of the load-bearing walls of the building from the L3 storey to the flat roof, Execution of reinforced concrete ceilings with balconies from the L4 storey upwards, and flat roofs, Execution of the foundation slab with surface hardening, reinforced concrete column and garage ceiling at the location of the crane, Performing other reinforced concrete works, including pillars, staircases, elevator shafts, caps over ventilated fireplaces, slabs over air intakes and smoke exhaust chimneys in accordance with doc. design, Bricklaying of partition walls including installation plumbing, brickwork of ventilation chimneys, smoke exhaust shafts and attic in accordance with the design documentation, Execution of the embankment for the entrance ramp to the garage, from the bottom of the foundation slab to the foundation level, make a foundation layer th. 30 cm from compacted crushed stone up to Is = 0.97, lay concrete underlay, and make a ramp with surface hardening and brushing, Performing a complete air intake structure on the garage roof, Performing correction and finishing works on the existing structure, as indicated in the inventory of the existing state, Repair of garage floor A detailed description of the existing condition is in Annex 7 to the ToR. NOTE! The +0.00 building level has changed and is currently +279.50 m above sea level. This change was entered by the designer in the construction journal. b) Do the work. external, including: delivery and assembly of PVC, aluminum and steel window and door joinery with two-system hygrostered window diffusers, NOTE! The Employer allows the possibility of making window frames in white while maintaining all other properties indicated in the spec. tech. delivery and assembly of aluminum roller blinds for L0 level together with execution of electrical control installation, delivery and assembly of sectional door, execution of layers of finish. roof of a residential building, delivery and assembly of smoke vents with flashings and other elements. finishing, finishing the attic and ventilation chimneys together with flashings and other finishing items, finishing balconies with flashings and other finishing items, supplement thermal insulation and bucket foil on the pedestal, complete insulation of walls and balcony panels with the expedition, external window sills, flashings and other elements. finish, delivery and assembly of flag holders, police numbers, delivery and assembly of window and balcony balustrades, roofing pergolas, wooden blinds, exterior wipers, Paint the Traffic Organization Plan for the underground garage c) Works. internal, including: making openwork walls and doors made of mesh for storage rooms, making plasterboard enclosures, making system buildings in corridors, supplying and installing steel door joinery, making floors with insulation and finishing, finishing the walls, i.e. insulation of internal walls, plastering and priming painting, finishing of ceilings, i.e. insulation of ceilings, plastering and painting with priming, plastering inside smoke exhaust ducts, supply and installation of ladders, stair railings and interior wipers. d) Finishing works of the inverted roof of the garage, including: execution of roof layers above the garage in the inverted system in accordance with the documentation, NOTE: The Employer excludes from the scope of the order the planting of trees and extensive vegetation. e) Supplementary works The detailed scope of works is described in siwz with attachments.

Download full details as .pdf
The Buyer:
Zakłady Techniki Komunalnej Sp. z o.o
CPV Code(s):
45000000 - Construction work
45200000 - Works for complete or part construction and civil engineering work
45210000 - Building construction work
45211000 - Construction work for multi-dwelling buildings and individual houses
45223100 - Assembly of metal structures
45260000 - Roof works and other special trade construction works
45261210 - Roof-covering work
45320000 - Insulation work
45400000 - Building completion work
45410000 - Plastering work
45421000 - Joinery work
45430000 - Floor and wall covering work