The purpose of this consultation is to carry out a technical inspection mission for the locks (excluding the Montmacq lock) and the Louette pumping carried out as part of the Seine Nord Europe Canal project. The purpose of the technical inspection is to contribute to the prevention of the various technical hazards likely to be encountered in the realization of the works
lot 1: Noyon, Catigny, Allaines and Peronnelot 1:- Noyon lock (60)- Catigny lock (60)- Allaines lock (80)- Péronne maintenance center (80)- Jonction lock in Allaines (80)- technical buildings of the Bassin de Louette in Allaines (80)- captaincy of the marina of Allaines (80)
lot 2: Marquion and Oisy le Vergerlot 2:- Marquion lock (62)- Oisy le Verger lock (62)- Marquion fulcrum (62)