HLS Installations
-Dismantling 76 furnishings and approx. 670 m pipe
-New waste water pipe approx. 245 m
-New cold water pipe approx. 490 m
-33 installation walls with installation elements and planking
-2 handicapped accessible toilet facilities
-2 height-adjustable washbasin system
-Dismantling of 3 supply and exhaust air systems in the KG
-Dismantling of approx. 90 m² air duct and approx. 240 m winding seam pipe
-New installation of 3 supply and exhaust air systems in the KG
-New installation of heating connection of the 3 heating coils of the 3 air conditioning systems
-Fire protection of 209 radiator connections through the ceiling
-New installation of approx. 90 m² air duct and approx. 320 m winding seam pipe
-New installation of 55 exhaust air dispenser valves and 33 ceiling air outlets