Follo Ren IKS invites tenderers to an open tender contest for container management, transport and reception/treatment of inert matter from our recycling stations.
The contest is divided into three sub-contracts:
Sub-contract 1: demolition matter: 3500 tonnes a year;
Sub-contract 2: porcelain and ceramics for material recycling: 600 tonnes a year;
Sub-contract 3: plasterboard with tiles: 180 tonnes a year.
Demolition matter means concrete, brick, roofing tiles, glass, fibre glass, porcelain, ceramics, stoneware, etc.
The estimated volume of the assignment is approx. 3500 tonnes a year.
The contract comprises the following:
• transport of demolition matter from the contracting authority’s recycling stations;
• container management for the collection of demolition matter at our three recycling stations;
• receipt and required treatment/disposal of demolition matter.
The contract period is from 1 January 2021 until 31 December 2022 and the contracting authority will have the unilateral option to extend the contract for 1 year + 1 year, a total of 4 years.
The porcelain and ceramics can be, for example, toilets, washbasins, plates and tiles.
The estimated volume of the assignment is approx. 600 tonnes a year.
The contract comprises the following:
• transport of porcelain and ceramics from our recycling stations;
• container management for the collection of porcelain and ceramics at our three recycling stations;
• receipt and required treatment/material recycling of porcelain and ceramics (minimum 70 % must be recycled).
The contract period is from 1 January 2021 until 31 December 2021, with a unilateral option for the contracting authority to extend the contract for 1 + 1 year to a total of 3 years.
The estimated volume of the assignment is approx. 180 tonnes a year.
The contract comprises the following:
• transport of plasterboard with tiles from our recycling stations;
• container management for the collection of plasterboard with tiles from our three recycling stations;
• receipt and required treatment/disposal of plasterboard with tiles.
The contract period is from 1 January 2021 until 31 December 2022 and the contracting authority will have the unilateral option to extend the contract for 1 year + 1 year, a total of 4 years.