A 2, km 30,101, new construction of a green bridge over the A 2 and L 93, lot 1 bridge and road construction
1 Psch Technical processing Engineering structure, irritation barriers and vehicle restraint system
Construct approx. 1,650 m³ excavation pit
approx. 900 m² drainage layer on the building
approx. 370 m² drainage layer on the building
approx. 1,200 m³ Bew. Concrete foundation
approx. 1,050 m³ Bew. Concrete rebate
approx. 160 m³ Bew. Concrete pillars
approx. 1,250 m³ Bew. Concrete foundation
Installing approx. 70 t of prestressing steel
Installing approx. 850 t of reinforcing steel
approx. 3,500 m² of concrete for protective layer
1 Psch shoring
1 Psch Montageunterstützung
approx. 165 m install steel railing bridge
approx. 3,350 m² sealing layer from a bitumen welding membrane
approx. 100 m² sealing layer from a bitumen welding membrane
approx. 320 m steel pile driver
approx. 220 m² wall plinth for ISW
approx. 900 m² wall element for ISW
Installing approx. 160 pcs posts for LSW
approx. 4 pcs service door in LSW
approx. 2 pcs MSÜ produce, reserve, dispose, with FRS
Removing and storing and processing approx. 7,000 m³ of topsoil
approx. 1,500 tonnes of non-hazardous waste from topsoil treatment
Supplying and installing approx. 14,000 m³ of soil
Produce approx. 15,000 m² of flat surface
approx. 22.750 m² Rasenansaat
Approx. 140 m of plastic pipeline production incl. trench production
Produce approx. 16,280 m² of ballast base course
approx. 5,900 m² of geosynthetics with reinforcement. Build in
approx. 500 m SE of steel dismantling and erecting
approx. 671 m of wildlife protection fence supply and manufacture