General renovation Walter-Höllerer-Realschule Sulzbach-Rosenberg - locksmith work 02 BA 1
General renovation Walter-Höllerer-Realschule Sulzbach-Rosenberg - locksmith work 02 BA 1.
Locksmith work 02 BA 1:
- approx. 67 m 2nd Stair railing made of sheet steel construction;
- approx. 10 m 2nd Platform railings made of flat steel, frame construction with flat steel filling, powder-coated, small-area;
- approx. 74 m oak handrail with support profile;
- approx. 13 m 2nd Ramp railing made of flat steel, frame construction with flat steel filling, powder-coated;
- approx. 28 m oak handrail with support profile;
- approx. 25 m stainless steel bumper strips with support profile.