The contracting entity intends to supplement and strengthen the outer boiler plants at Huskvarna (HCHF) and Ryhov (HCRY) that are used for reserve and peak load production of district heating. The contracting entity intends to install a total of five (5) complete bio-oil-fired boilers, in three stages, with the necessary peripheral equipment for district heating production to the existing district heating network. The new boilers shall have a heat output of 16 MW per boiler at full load and at all normal operating temperatures.
The contracting entity intends to supplement and strengthen the outer boiler plants at Huskvarna (HCHF) and Ryhov (HCRY) that are used for reserve and peak load production of district heating. The contracting entity intends to install a total of five (5) complete bio-oil-fired boilers, in three stages, with the necessary peripheral equipment for district heating production to the existing district heating network. The new boilers shall have a heat output of 16 MW per boiler at full load and at all normal