Renovation of complex Zwijnaarde A14/E17 x A10/E40 in Ghent:
‐ Slingerviaduct West (brugnr. 0.010.055.1);
‐ Slinger viaduct Oost (bridge no. 0.010.056.1);
‐ Brug West (brugnr. 0.010.054.1);
‐ Bridge East (bridge no. 0.010.057.1);
‐ Bridge West Ringvaart and R4 (brugnrs. 0.014.060.2 and 0.014.061.3);
‐ Bridge Oost Ringvaart and R4 (brugnrs. 0.014.061.4 and 0.014.060.3);
The contract mainly comprises:
- Drawing up the necessary site and diversion signalling plans per phase of the works;
- Placing/keeping in service/removing the necessary site and diversion signalling;
- Renewing the waterproofing system over the entire surface of the
bridges;
- Replacing the bridge edges in natural stone and concrete capstone with a reinforced
concrete bridge edge;
- Renewing the safety bumpers;
- Installing a new handrail;
- The installation of new bridge decks with double water inlet;
- Renewing the RWA drains;
- Renewing the bridge deck joints;
- Placing an epoxy scraping layer on the bridge decks;
- Renewing the roadway and footpath;
- Removing the protective coating along the underside of the bridges (asbestos);
- Carrying out the necessary concrete repairs along the underside of the bridges;
- Protecting the visible concrete of the bridges;
- Carrying out a study into the state of the after-tensioning of the bridges;
- Renewing the roadway, footpath, embankment troughs, safety bumpers and
cement concrete pavement under the service path in the connections to the bridges and between
the bridges;
- Maintenance of works during the guarantee period.