Painting work on walls, ceilings and built-in parts on the 3rd floor, 4th floor, 4th floor and 7th floor in the Burgsee wing in Schwerin Castle
- Wand- und Deckenbeschichtung 3RD AND, 4TH AND, 4TH ZG, 7TH AND
- Coating of wooden and metal components 3rd floor, 4th floor, 4th ZG
The LV 3342 Maler 2 includes the following measures on the 3rd floor, 4th floor, 4th ZG and 7th floor in the Burgsee wing in Schwerin Castle:
- Substrate preparation, protective measures, sample production
- Coating of plastered walls and ceilings, as well as plasterboard walls and ceilings
- Painting of skirting boards and cover strips
- Coatings on heating pipes