Universität zu Lübeck - Refurbishment of pre-hospital building 61,200 isotope laboratory – technical equipment

Technical planning of technical equipment plant groups 1-5, 7+8, according to HOAI LPH 1-9

Building 61.200_Isotopenlabor is part of the building complex of the so-called preclinical institutes of the University of Lübeck. It is located in the southwest. Area of the campus area of the university. Buildings 61, 62 and 63 as well as the associated supplementary buildings house institutes of the university and the teaching areas (practical rooms, seminar rooms, lecture halls).

Building 61,200 is to be built within the refurbishment of the Ges. Preclinical institutes can be rebuilt as a separate construction phase. For the new façade, the result of an ideas competition that has already been carried out will be combined. taken over into the preliminary planning and further processed. The design manual of the first prize winner of the ideas competition for the new façades is binding.

The isotope laboratory was built between 1976 and 1979 and consists of two floors. In the basement there are storage rooms for radioactive materials and equipment. Also located in the KG. Decay system with its three collection tanks has already been renewed in the course of the adjacent new building Isotopenlabore_Geb.61.250. The laboratory areas with course and ancillary rooms on the ground floor are to be completely renovated.

Planning offices are invited to participate in the competition, which have the performance profile of technical building equipment, in the annexes. 1-5, 7 + 8, according to HOAI cover and similar dimensions in the past. have been realized. Work phases 1 - 9 should be worked on. The assignment will take place in stages. The client reserves the right to use only a part of the basic services from the aforementioned service profiles. to forgive. The total construction costs of KG 400 are estimated at approx. € 4.2 million gross.

The restricted areas in front of and behind the building are in the relocation. of the dimensions. to be noted.

The construction time / period of construction of the building suggested that pollutants such as asbestos and KFM as well as PAHs or PCBs were introduced into the buildings. In 2018, an investigation report was prepared for the recording of building pollutants. The report on this and, if necessary, any necessities arising from it must be taken into account.

The services to be provided require experience in dealing with the public sector. Building in existing buildings as well as experience. with energy-efficient renovations.

The realization of the measurements. will take place after approval by the Ministry of Finance. Know. of the Procurement Manual (VHB), the HBBau and .VOB are required. The assignment takes place in stages. on the basis of the enclosed draft contract.

The vorl. Cost estimate for KG 200 to 600 amounts to approx. € 6,000,000 net. In this case, the costs are distributed among the KG as follows:

KG 300 approx. 2,030,000 euros, net

KG 410 approx. 350,000 euros, net

KG 420 approx. 290,000 euros, net

KG 430 approx. 1,240,000 euros, net

KG 440 approx. 220,000 euros, net

KG 450 approx. 100,000 euros, net

KG 470 approx. 980,000 euros, net

KG 480 approx. 370,000 euros, net

Total KG 400 approx. 3,550,000 euros, net

Project period: Completion. FU construction (LPh 3 with LPh 4): July 2024 Start of construction: approx. September 2025 Construction time: approx. 25 months

The country has drawn up a climate protection strategy and is pursuing climate neutrality by 2050. Accordingly, there is a substantial. Objective of the planning in the sustainability of the renovated building. The Anford. Energy and sustainability are attached in the appendix and must be observed. The client is committed to the principles of sustainable construction, as set out in the guidelines of the Federal Ministry for the Environment, Nature Conservation, Building and Nuclear Safety. During planning, particular emphasis must be placed on high energy efficiency and sustainable construction, which can be expected to be low operating costs in the long term. Monument protection concerns are not to be taken into account.

Procedural tender documents are available on the e-tendering platform for the procedure under https://www.meinauftrag.rib.de/public/DetailsByPlatformIdAndTenderId/platformId/7/tenderId/121005640.

Download full details as .pdf
The Buyer:
Land Schleswig-Holstein vertreten durch Gebäudemanagement Schleswig-Holstein AöR
CPV Code(s):
71000000 - Architectural, construction, engineering and inspection services