The subject of the Order is:
(a) the repair of the wings K, L, M and 2/3 of the J wing in the District Court building in Warsaw at “Solidarity” 127 in Warsaw with the delivery, assembly and commissioning of two lift equipment (replacement of equipment),
(b) the construction of the elevator shaft with the delivery, installation and commissioning of the crane in the M wing, the construction of the staircase in the K wing and the construction of the technological canal,
with a legitimate decision for the use of the renovated premises falling within the scope of the subject matter of the contract and the decision of the UDT for the operation of the lifting equipment referred to in points (a) and (b),
(c) maintenance of installed equipment, systems and installations during the warranty period.
The Contracting Authority plans to carry out a vision of a local place covered by the order. For information on the vision, see the order opz. Participation in the local vision is not mandatory, and therefore they will not have
under Article 226 (1) (18) of the Act.
The object of the order is: (a) the repair of the wings K, L, M and 2/3 of the J wing in the District Court building in Warsaw at “Solidarity” 127 in Warsaw with the delivery, installation and commissioning of two crane equipment (replacement of equipment), b) the construction of the elevator shaft together with delivery, assembly and operation of the the operation of the crane in the M wing, the construction of the staircase in the K wing and the construction of the technological canal,
with a legitimate decision for the use of the renovated premises falling within the scope of the subject matter of the contract and the decision of the Office of Technical Service (UDT) for the operation of the lifting equipment referred to in points (a) and (b),
c) maintenance of installed equipment, systems and installations during the period of warranty.About awaren.Contractors.apply may Contractors, against whom there is no grounds exclude. , as defined in Art.108 (1) and Article 109 (1), point 3-5, paragraph 7 to 8, paragraph 10 of the Act, section .Art.109 (3) and Article 110 (2) of the Paragraph. The Contractor shall show that: 1) he is insured against liability in respect of the activities carried out related to the subject of the contract, i.e. the performance of the works of the structure. , for the sum of at least PLN 15.000.000,00 (in words: fifteen million zlotys 00/100),
2) has financial appropriation.or creditworthiness of min.5.000.000.00 zł (verbally: five million zlotys 00/100) .In the case of Contractors apply jointly for a grant. procution. each of the above conditions Contractors may fulfill in total;
Assessment of compliance with the conditions of participation in the progression.will be effect.on the soon:satisfy/non-fulfilment, on the basis of the submitted statement. Contractors and subject evidentiary requirements for progress.
Contractors who fulfil the conditions concerning technical or professional capacity may apply for the award of a contract, i.e.The Contracting Authority will consider the above condition to be fulfilled if the Contractor demonstrates that:
1) has an experience.i.i.will show that during the period:a) last 5 years before the deadline for submission of tenders, and if the pro.operable period is shorter-during this period, duly performed at least 2 construction and installation works rely.on the repair works, including 1 in the build.entered in the register of monuments or under the care of a monument conservator, with a value of not less than PLN 5.000.000,00 (PLN five million) with VAT each and will show that these works have been made duly;
(b) the last 3 years before the expiry of the deadline for the submission of tenders, and if the operating period is shorter-during this period, duly performed or performs at least 2 maintenance services. in each installation:ventilation, air conditioning, electrical, sanitary, each in a facility with a total area min.12.000 m2 and will show that these services have been duly or duly performed,
(c) the last 3 years before the deadline for submission of tenders, and if the operating period is shorter-during this period, duly performed or performs at least 2 services, each worth at least PLN 50.000,00 (in words: fifty thousand zlotys) with VAT, relies.on the maintenance of elevators, each diagram or performed under one contract and show that these services have been duly or duly performed.
In the case of recurring or continuous services that have not been completed, the Contractor shall demonstrate the realization of the required value at the date of submission of tenders.
In the case of Contractors applying jointly for the award of the contract, the Contractors may satisfy together (as a means of summing the potential in detail. Contractors in the order. satisfy this condition in aggregate, however, this Contractor who has be.directed.to reality.works must demonstrate that realiz. , at least 1 job in the bud.inscribed in the cruise.monuments or being. under the care of preservation.C.D.in section III.1.2"List and brief description of crits...”