Lot 02 Overhead contact lines with earthworks
- 1100 m single catenary (double-track)
including transverse structures
- Dismantle 28 concrete pylons and
To dispose
- Dismantle and dispose of 4 steel poles
- 4 steel masts reusable
extend
- Demolition of 44 m3 concrete foundation and
dispose of, including earthworks
- 36 pcs pipe foundation (drilling method)
including earthworks
- Refurbish 2 pcs pipe foundation (available)
(Remove sand or concrete backfill)
- 38 pcs steel octagonal masts, supply and
build in; therefrom:
- 36 pcs combined with public
lighting
- 5 pcs combined with light signal /
Fahrsignalanlagen
- 4 pcs with wheel tensioning 2x 10 kN
- 1 pc with feed-in
- 1 pc with track separation
- 3 pcs mobile foundation with mast (up to 10 m
/ 140 kNm) as construction time. Makeshift
- 18 pcs new transverse structures (transverse spans)
with one or more straightening ropes
- Deliver and assemble 6 pieces of sheet trigger
- 2 pcs wheel tensioning 2x10 kN,
Weight guidance in the fattening, deliver and
assemble
- 2 pcs wheel tensioning 1x10 kN,
Weight guidance in the fattening, deliver and
assemble
- 930 m new chain plant (double-track),
incl. current-proof trailers, elt. Connector
Regulage
- 170 m new single-catenary (double-track)
incl. elt. Connectors, regulage
- 1 piece new construction fixed point for chainwork, two
Tracks
- 1 pc new construction feed point for chainwork,
two tracks, including earthworks
- 1 pc new track separation for
Chainwork, two tracks