New construction of secondary school Geisenfeld with triple sports hall - VE33601 plastering work inside;
preparatory work;
Untergrundprüfung 1,00 psch;
Schutzabdeckung 1.215,00 m²;
Haftbrücke Betonbauteile 1.800,00 m²;
Installation slots close 1,320.00 m;
Kantenprofil 6.200,00 m;
Abschlussprofil 80,00 m;
Dehnfugenprofil 25,00 m;
Anputzleiste, PVC, 15 mm 370,00 m;
Plaster base boards 25.00 m²;
Plaster base boards strip-shaped 40.00 m;
Interior plaster rooms with wall tiles and shafts;
Lime cement plaster plaster plaster tiles single layer fine 830.00 m²;
Lime cement plaster top plaster non-tiled surfaces single-layer fine, 3 mm, h up to 3.50 m, walls 550.00 m²;
Interior plaster auditorium, classrooms, corridors, stairs, technology and other rooms;
Lime cement plaster two-layer fine, Stb walls, templates, columns and balustrades 1,115.00 m²;
Lime cement plaster two-layer fine, stairwells, stb walls, columns and balustrades 865.00 m²;
Lime cement plaster two-layer fine, stairwells, Stb ceilings, landings and staircases435.00 m²;
Lime-cement plaster two-layer fine, brick masonry walls, 15 mm, h to 3.50 m 5,240.00 m²;
subsequent plastering work;
Subsequent plastering of small areas 36.00 pcs;
Plaster wall slots 87.50 m;
Subsequent plastering of wall openings 10.00 pcs;
working scaffolding
Working scaffolds inside 1,430.00 m²;
see II. 1.4