At the Mühlenredder in Reinbek, a new fire brigade tool shed with a surface of 3200m² built in timber construction is being built on a 6400m² plot surrounded by schools and residential buildings. The property is a former grandplatz of the local sports club and is therefore undeveloped. There is a so-called kink in front of the property, a planted wall that must be protected during the construction project.
gardening, landscaping and civil engineering works
Push off 350 sqm of turf scar and herb layer and drive off
Break off 300 m of concrete edging and drive down
Break off 540 m2 of paved paving area and leave
Grate and descend 100 m2 of root system shrubs
25 pcs. install existing boulders
Dissolve 230 m3 of soil mixture and drive off
Breaking off 140 t of contaminated soil and driving off
Loosen and store 380 m3 of soil
Install 20 pcs. road drain
Make 300 m trench, lay cable protection pipe
246 m installation of an angled support wall
Produce and compact 5580 m2 of subsoil plan
Produce 5480 m2 load-bearing and frost protection layer
530 m board concrete installation
produce 100 m2 gravel rake
Produce 800 m2 of concrete paving area
Produce 4680 m2 of asphalt pavement
Create 580 m road markings
Install 175 m wire mesh fence
Installing 2 double wing gates
1 pc. Installing waste containment
Make 10 replanting of trees (aeration ditch, edging, tree pit)
produce 350 m2 lawn seed