Sports floor work in the sports hall required for the construction of the three-speed secondary school with a two-field sports hall.
- sports floor sandwich approx. 1200 m²
- ground sleeve covers approx. 94 pieces for roller hockey bands, pitch posts,
- Field markings approx. 1800 m
- sports floor heating approx. 1170 m²
- sports equipment firmly integrated into impact wall 1 piece climbing rope, 4 pieces bars walls
- sports equipment movable jacks and climbing poles (integrated into baffle wall)
- Electric sports equipment Basketball systems mounted on roof structure
- sports gates, ground sleeves and ground fixings for handball, soccer, volleyball, badminton